(KPC)-11 defects Geohazard Pipeline Defects rectification

Dec. 2021 - Mar. 2022

Planning, implementing, and Handing over the rectification works for 38 defect locations at Kurdistan Oil Pipeline for KPC. The works included: Earthworks, Water Pipe installations, Culvert constructions, Re-slope & Re-scaling works, Gabion boxes, Backfilling, Riprap installation

Scope Of Work

Pipeline ROW geohazard defect rectification.

Location

Iraq-Erbil

Work Size

11 defects.