GKPI PF2 TO IPRR PIPELINE AND SHEKHAN PS

Date: 20/12/2017 – 1/5/2018

  •  Procurement and Construction Contract

  • Complete planning,Project Management,Excellence Execution.

  • Preparing Project Documenations such As Builts Drawings,Inspections  Reports, Method Statement,Certificates and Calibrations, Surevy Reports.

  • Coordination and supervision.

  • Quality Control Department provide quality control engineer per each activity.

  • Compelete Civil work execution according Specifications,Approved typical drawings and International standard.

  • HSE as per ISO 45001.

Scope Of Work

24″ & 12″ Pipeline & Pump Station

Location

Duhok-Shekhan

Work Size

1 Km Pipeline & 2500 Dia inch Piping, ROW, Stringing, Bending, Welding, Blasting & Coating & Painting, Fabrication, Steel Supports, Trenching, Bedding, Lowering, Padding, FOCC & FOC, Backfill, Civil Works

The site is best viewed using IE11 and above, Mozilla Firefox, Safari and Chrome

All rights reserved to K1 Group | 2022