(KPC)-38 defects Pipeline Geo-hazards Rectification.

April 2021-Nov. 2021

Planning, implementing, and Handing over the rectification works for 38 defect locations at Kurdistan Oil Pipeline for KPC. The works included: Earthworks, Water Pipe installations, Culvert constructions, Re-slope & Re-scaling works, Gabion boxes, Backfilling, Riprap installation

Scope Of Work

Pipeline ROW geohazard defect rectification.

Location

Iraq-Duhok

Work Size

38 defects.